Replace Deteriorated Transite Waterline and Increase Fire Protection Capabilities

The work consists of the general construction of 3,750 LF of a 10-inch waterline in Bunker Road, installation of 940 LF of a 6-inch waterline at the horse stables with service to the blimp hangar, valve vault modifications at the Fort Barry Water Tank, and a 3-way valve assembly box on an existing 12-inch waterline for a future connection.